Sources, junctions and the measurement loop¶
This page explains how groundfield feeds a grounding system — current and
voltage sources with two terminals, nodes without soil contact
(junctions) — which of the three impedances of a result to read, and how
the fall-of-potential measurement is wired. Read it before you set up a
fault or a measurement study, or when two impedances of one result
disagree.
A grounding system is never fed in isolation. A fault current enters at one point and returns through a remote source; a measurement instrument injects between the earth electrode and an auxiliary electrode and reads the voltage against a probe; cable joints and instrument terminals are nodes without soil contact.
Mathematical and physical context¶
The engines solve a linear network: the soil multiport of the electrodes, the branches of the conductors and the nodes that connect them (see the engine family). Current sources enter as impressed node currents. Voltage sources enter as a fixed potential difference between their terminals whose current is an additional unknown (modified nodal analysis). Every quantity is therefore linear in the source values, and results of several sources superpose.
The potential reference is remote earth: \(\varphi \to 0\) far away from all electrodes. The potential of an electrode is therefore its earth potential rise (EPR) against remote earth, and a voltage between two points — a touch voltage, a measured reading — is a difference of such potentials.
Two-terminal sources¶
A current source has two terminals:
attached_to— the node where the current \(I\) enters (an electrode, a junction or, through its cluster, a bonded group);return_to— the node where it leaves again;Nonemeans the return through remote earth.
The solver injects \(+I\) at attached_to and \(-I\) at return_to
(groundfield.solver._pipeline.inject, shared by every backend). The
current balance holds to round-off, and a two-terminal source equals the
superposition of two one-terminal injections
(tests/test_two_terminal_sources.py). A manual counter-source at the
return electrode, as generators used before, now warns as a double count.
Sources are validated before any work is done (World.check, called by
every solve): unknown node names raise with a did-you-mean suggestion,
magnitudes must be finite, a current source must not be 0 A, a source
whose two terminals end in one cluster (a short circuit) raises, and so do
voltage sources without internal resistance that form a loop (the message
names the sources of the loop).
Measurements and audit trail
Up to 0.15.0 return_to was stored but ignored, so an auxiliary
electrode carried no current and the station potential did not depend
on its distance (finding 10.16, F01). The validation of voltage-source
loops is finding 10.66.
Voltage sources¶
A VoltageSource drives attached_to against return_to (or against
remote earth) with the voltage \(U\) behind an internal impedance
\(Z_q = R + j\omega L\) (internal_resistance_ohm, internal_inductance_h;
0 by default, the ideal source) — an instrument that drives a test
voltage, or the source voltage of a fault loop behind the impedance of the
feeding transformer and line. With the potentials \(\varphi_a\) and
\(\varphi_r\) of its two terminals and its current \(I\) the source imposes
the terminal voltage is the source voltage less the drop across the
internal impedance. The current is solved for and reported like the
impressed current of a current source (result.sources[k].current);
input_impedance() \(= U/I - Z_q\) is the impedance the source sees,
without its own \(Z_q\).
For one source the answer is the 1 A current-source solve scaled by
\(Z_\text{in}\) the input impedance of the network at the source's
terminals. This is the fault current \(I_F = U_q/(Z_q + R_F + T)\) of a
fault study, with \(U_q\) the source voltage, \(R_F\) a fault resistance and
\(T\) the input impedance of the network, and a voltage source saves that
step. With several voltage-driven terminals in one solve the scaling would
need the transfer matrix of all of them; the result is their
superposition, and the input impedance of each is then an apparent one. A
series resistance written as a junction at the terminal, a lumped
conductor to the electrode and the ideal source at the junction gives the
same solution as internal_resistance_ohm to round-off
(sources).
Measurements and audit trail
Up to 0.15.0 voltage sources were dropped with a warning (finding 10.51); they are solved since 2026.11. Before 2026.11 the junction pattern above was the only way to give a source a series resistance.
Junctions¶
A junction (create_junction(world, position=...)) is a network node
without soil contact: conductors may start and end at it and sources may
attach to it, but it leaks no current. Junctions model cable joints of a
PEN conductor and the terminals of a measurement instrument. A junction
must reach the soil through its conductors; a dangling junction raises.
The solve reports its potential in result.metadata["junction_potentials"].
Measurements and audit trail
Junctions replace the 5 cm pseudo-rods that the layout builder used for PEN joints up to 0.15.0: those were small electrodes, and depending on the penetration they leaked several per cent of the test current (finding 10.38).
Three impedances¶
A result offers three impedances. They coincide for a single electrode fed against remote earth and differ as soon as conductors connect the fed cluster to other electrodes:
| Impedance | Definition | Accessor | What it is |
|---|---|---|---|
| input | \(Z_\text{in} = (\varphi_a - \varphi_r)/I_s\) | result.input_impedance(source) |
the driving-point impedance of the whole connected system |
| cluster | \(Z_c = \varphi_c / I_{c,\text{leak}}\) | result.cluster_impedance(name) |
the local spreading impedance of the fed cluster |
| electrode | \(Z_e = \varphi_e / I_{e,\text{leak}}\) | result.grounding_impedance(name) |
one electrode of a cluster over its own leakage |
Here \(I_s\) is the source current, \(\varphi_a\) and \(\varphi_r\) are the potentials of the clusters the source attaches to and returns at, \(\varphi_c\) is the length-weighted cluster potential and \(I_{c,\text{leak}}\) the sum of the leakage currents of the cluster's electrodes; \(\varphi_e\) and \(I_{e,\text{leak}}\) are the potential and the leakage of one electrode. For a return through remote earth the input impedance is the EPR per injected ampere.
The split factor \(s = I_{c,\text{leak}}/I_s\) is the share of the injected current that leaks through the fed cluster itself. For a one-terminal source \(\varphi_a = \varphi_c\) and \(\varphi_r = 0\), so
(tests/test_impedance_quantity.py::test_split_factor_links_input_and_cluster_impedance).
In a TN network the station's cluster leaks only a part of the current —
the rest flows through the PEN conductors into the house foundations — so
\(s < 1\) and the cluster impedance can exceed the input impedance by a
large factor. For an engineer the input impedance is the quantity of
interest: it is what a fall-of-potential measurement approaches and what a
fault sees. It is the default (quantity="input") of sweep,
convergence_study and the rho-f exporters (rho_f_from_field_result,
rho_f_standard_from_results); quantity="cluster" and
quantity="electrode" give the other two. Every fit records the quantity
it represents.
Measurements and audit trail
The input impedance is the default since 2026.11 (findings 10.18,
10.19). Before, sweep reported the cluster impedance and the
exporters the electrode impedance; quantity="cluster" and
quantity="electrode" reproduce those semantics.
The fall-of-potential measurement¶
The classical measurement of a grounding impedance injects a current \(I\) between the earth electrode E and an auxiliary electrode H at the distance \(D\), and reads the voltage between E and a probe S placed between them at the distance \(x\) from E. For a hemispherical electrode E of radius \(r_E\) in homogeneous soil, with H far enough away to act as a point source, the reading is
the true resistance \(\rho/(2\pi r_E)\) plus the potential that the return
current at H and the injected current at E impose on the probe. The
correction vanishes when \(1/(D - x) = 1/x + 1/D\), that is for
\((x/D)^2 + x/D - 1 = 0\) or \(x/D = (\sqrt5 - 1)/2\): the reading equals the
remote impedance when the probe sits at 61.8 % of the distance to H
(Tagg 1964).
tests/test_two_terminal_sources.py::test_fall_of_potential_follows_the_61_8_percent_rule
checks that groundfield reproduces this rule. The finite size of a real
earthing system leaves a residual error at 61.8 %, and for an extended
system such as a whole LV network the electrical centre is not known; the
fall-of-potential tutorial
shows how far the auxiliary electrode must be.
The TN network generator builds the measurement as it is wired in the field:
- two junctions at the instrument,
meas_Handmeas_S, at the position of the substation and the height of the leads; - the feed lead from
meas_Hto the auxiliary electrode, the probe lead from the probe electrode tomeas_S; - one two-terminal source
attached_to=<station>,return_to="meas_H"; - the reading
generators.measured_impedance(result)\(= (\varphi_E - \varphi_S)/I\).
With junctions, resistive leads do not change the reading
(tests/test_measurement_loop.py::test_resistive_leads_do_not_change_the_reading)
and inductive leads shift it by their coupling without shorting it. Leads
that run towards the same side are laid side by side (touching), because
two coincident conductors have no finite mutual inductance. The leads run
horizontally at MeasurementLeadConfig.depth_m below the surface; a depth
of 0 places them 0.1 m above ground.
input_impedance of the measurement source is the two-pole impedance
between E and H — the loop impedance including the auxiliary electrode
and the feed lead — not the reading; measured_impedance is the reading.
Measurements and audit trail
Up to 0.15.0 the leads were wired to the station itself: the probe lead short-circuited the instrument and the feed lead closed the loop through the metal (finding 10.17).
Validity¶
- The source model is an impressed current (ideal) or an impressed voltage behind a lumped internal impedance \(R + j\omega L\) (no frequency dependence of \(R\) and \(L\) themselves; a source with a frequency-dependent impedance needs one solve per frequency with its values).
- Two-terminal sources, junctions and voltage sources are supported by
every backend — the image family, the
momfamily andfem(registry capabilitiestwo_terminal_sources,junctions,voltage_sources). - Measured readings include the coupling of the leads only if the leads
are modelled as inductive conductors (
inductance_model="neumann").
Corrected statement
Earlier versions of this page said that fem ignores return_to and
rejects junctions and voltage sources. That held for the
equivalent-hemisphere fem before user decision Q37; the conforming
fem runs the shared network pipeline and its registry entry declares
all three capabilities.
Literature¶
- Tagg, G. F. (1964). Earth Resistances. George Newnes, London (the 61.8 % rule of the fall-of-potential method).
- IEEE Std 81-2012. IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Grounding System.
- EN 50522:2022. Earthing of power installations exceeding 1 kV a.c. (earth potential rise and touch voltage as the quantities of the safety assessment).