This page lists the rules the --calc step of gm-cli towers run applies to every tower. The physics behind them is explained in Physical background.

flowchart TD
    A["Grid values per tower<br/>I_k, r, t_F"] --> B["Permissible touch voltage<br/>U_TP = U_TP(t_F)"]
    C["Fall-of-potential profile"] --> D["Z_E,62 (62 % method)"]
    B --> E{"U_E = r · I_k · Z_E,62<br/>≤ 2 · U_TP ?"}
    D --> E
    E -- yes --> ZE["ZE<br/>compliant (earthing impedance)"]
    E -- no --> F{"max. measured U_T<br/>≤ U_TP ?"}
    G["HGT1 readings scaled to I_E"] --> F
    F -- yes --> UT["UT<br/>compliant (touch voltages)"]
    F -- no --> M["MASS<br/>measures required"]

1. Grid values

For every tower the tool determines (see Preparing a campaign for the priorities between the sources):

Quantity Symbol Sources
short-circuit current \(I_k\) flat value per line · short-circuit line model · grid-data workbook · configuration default
reduction factor \(r\) flat value per line · grid-data workbook · configuration default
fault clearing time \(t_F\) position on the line · grid-data workbook · configuration default

The earth current is \(I_E = r \cdot I_k\).

Fault clearing time

With line_protection.enabled, the clearing time follows from the position of the tower on its line (Leitungsschutz sheet):

\[ \text{position} = \frac{n - n_{first}}{n_{last} - n_{first}} \cdot 100\,\% \]

with the tower number \(n\) and the first and last tower number of the line (\(n_{first}\) = Mast_Anfang, \(n_{last}\) = Mast_Ende).

Case Clearing time Zone (ProtectionResult.zone)
Schnellzeit_von_Prozent ≤ position ≤ Schnellzeit_bis_Prozent (default 16 … 84 %) t_Schnellzeit_s Schnellzeit
position outside this band, or outside 0 … 100 % t_Endbereich_s Endbereich
t_Schnellzeit_s = t_Endbereich_s that time pauschal (flat)
position unknown (no tower range) the longer of both times unbekannt

The explanation is written to the protocol, e.g. "Position 17.9 % of the line length: instantaneous tripping from both line ends (distance protection)".

2. Permissible touch voltage

\(U_{TP}\) is interpolated linearly in the configured table at \(t_F\). Times outside the table use the value at the nearest end and log a warning.

3. Earthing impedance criterion (ZE)

The tower is compliant without considering the measured touch voltages if

\[ U_E = I_E \cdot Z_{E,62} \le 2\,U_{TP} \quad\Longleftrightarrow\quad Z_{E,62} \le \frac{2\,U_{TP}}{I_E} \]

This follows the design procedure of EN 50522 and EN 50341-1: the touch voltage is always only a part of the earth potential rise, so an earth potential rise of at most twice the permissible touch voltage is accepted without further proof.

4. Touch-voltage criterion (UT)

Otherwise the measured touch voltages decide. Every HGT1 reading is scaled to the earth current, \(U_T = U_{T,meas} \cdot I_E / I_{meas}\), and the highest value of the selected subset (touch_voltage_evaluation: readings with additional resistor by default) is compared with \(U_{TP}\):

\[ U_{T,max} \le U_{TP} \]

Categories

Code (Bewertung_Kategorie) Condition Verdict in the protocol
ZE \(Z_{E,62} \le 2\,U_{TP} / I_E\) The earthing-impedance measurement shows that the touch voltage is below the permissible touch voltage. No further measures are required.
UT criterion 3 not met, \(U_{T,max} \le U_{TP}\) The touch-voltage measurements at selected points show that the highest expected touch voltage is below the permissible touch voltage. No further measures are required.
MASS both criteria not met The touch voltages exceed the permissible values. Further measures are required.

MASS stands for German Maßnahmen (measures). Possible measures are, for example, potential grading, insulating the standing surface, improving the tower earthing or reducing the clearing time – the choice is an engineering decision outside the scope of this tool.

Footing resistance shown in the protocol

Situation Value shown
profile valid, no high-frequency value \(R_{A,62}\) from the profile
profile valid, high-frequency value deviates ≤ 20 % \(R_{A,62}\) from the profile
profile valid, high-frequency value deviates > 20 % high-frequency value, with a note
no valid profile (Messung_RA_Profil_bool = 0 or profile unusable) high-frequency value, with a note, or "not measured"

The footing resistance does not enter the assessment.

Worked example

Tower 3 of the demo campaign (--demo):

Step Value
position on the line (3 − 1) / (40 − 1) = 5.1 % → end zone
clearing time \(t_F\) 0.4 s
permissible touch voltage \(U_{TP}(0.4\,\text{s})\) 300 V
short-circuit current \(I_k\) (line model) 12.73 kA
earth current \(I_E = 0.66 \cdot 12.73\) kA 8.40 kA
earthing impedance \(Z_{E,62}\) 0.552 Ω
earth potential rise \(U_E = I_E \cdot Z_{E,62}\) 4.64 kV > 2 · 300 V → criterion 3 not met
highest touch voltage (with additional resistor) 420 V > 300 V → criterion 4 not met
result MASS – measures required

For comparison, tower 8 lies at 17.9 % (instantaneous tripping, 0.1 s, \(U_{TP}\) = 633 V): \(U_E\) = 0.66 · 11.2 kA · 0.121 Ω = 0.89 kV ≤ 1.27 kV, so it is compliant by the earthing-impedance criterion (ZE).