Assessment procedure¶
This page lists the rules the --calc step of gm-cli towers run applies to
every tower. The
physics behind them is explained in Physical background.
flowchart TD
A["Grid values per tower<br/>I_k, r, t_F"] --> B["Permissible touch voltage<br/>U_TP = U_TP(t_F)"]
C["Fall-of-potential profile"] --> D["Z_E,62 (62 % method)"]
B --> E{"U_E = r · I_k · Z_E,62<br/>≤ 2 · U_TP ?"}
D --> E
E -- yes --> ZE["ZE<br/>compliant (earthing impedance)"]
E -- no --> F{"max. measured U_T<br/>≤ U_TP ?"}
G["HGT1 readings scaled to I_E"] --> F
F -- yes --> UT["UT<br/>compliant (touch voltages)"]
F -- no --> M["MASS<br/>measures required"]
1. Grid values¶
For every tower the tool determines (see Preparing a campaign for the priorities between the sources):
| Quantity | Symbol | Sources |
|---|---|---|
| short-circuit current | \(I_k\) | flat value per line · short-circuit line model · grid-data workbook · configuration default |
| reduction factor | \(r\) | flat value per line · grid-data workbook · configuration default |
| fault clearing time | \(t_F\) | position on the line · grid-data workbook · configuration default |
The earth current is \(I_E = r \cdot I_k\).
Fault clearing time¶
With line_protection.enabled, the clearing time follows from the position
of the tower on its line (Leitungsschutz sheet):
with the tower number \(n\) and the first and last tower number of the line
(\(n_{first}\) = Mast_Anfang, \(n_{last}\) = Mast_Ende).
| Case | Clearing time | Zone (ProtectionResult.zone) |
|---|---|---|
Schnellzeit_von_Prozent ≤ position ≤ Schnellzeit_bis_Prozent (default 16 … 84 %) |
t_Schnellzeit_s |
Schnellzeit |
| position outside this band, or outside 0 … 100 % | t_Endbereich_s |
Endbereich |
t_Schnellzeit_s = t_Endbereich_s |
that time | pauschal (flat) |
| position unknown (no tower range) | the longer of both times | unbekannt |
The explanation is written to the protocol, e.g. "Position 17.9 % of the line length: instantaneous tripping from both line ends (distance protection)".
2. Permissible touch voltage¶
\(U_{TP}\) is interpolated linearly in the configured table at \(t_F\). Times outside the table use the value at the nearest end and log a warning.
3. Earthing impedance criterion (ZE)¶
The tower is compliant without considering the measured touch voltages if
This follows the design procedure of EN 50522 and EN 50341-1: the touch voltage is always only a part of the earth potential rise, so an earth potential rise of at most twice the permissible touch voltage is accepted without further proof.
4. Touch-voltage criterion (UT)¶
Otherwise the measured touch voltages decide. Every HGT1 reading is scaled to
the earth current, \(U_T = U_{T,meas} \cdot I_E / I_{meas}\), and the highest
value of the selected subset (touch_voltage_evaluation: readings with
additional resistor by default) is compared with \(U_{TP}\):
Categories¶
Code (Bewertung_Kategorie) |
Condition | Verdict in the protocol |
|---|---|---|
ZE |
\(Z_{E,62} \le 2\,U_{TP} / I_E\) | The earthing-impedance measurement shows that the touch voltage is below the permissible touch voltage. No further measures are required. |
UT |
criterion 3 not met, \(U_{T,max} \le U_{TP}\) | The touch-voltage measurements at selected points show that the highest expected touch voltage is below the permissible touch voltage. No further measures are required. |
MASS |
both criteria not met | The touch voltages exceed the permissible values. Further measures are required. |
MASS stands for German Maßnahmen (measures). Possible measures are, for
example, potential grading, insulating the standing surface, improving the
tower earthing or reducing the clearing time – the choice is an engineering
decision outside the scope of this tool.
Footing resistance shown in the protocol¶
| Situation | Value shown |
|---|---|
| profile valid, no high-frequency value | \(R_{A,62}\) from the profile |
| profile valid, high-frequency value deviates ≤ 20 % | \(R_{A,62}\) from the profile |
| profile valid, high-frequency value deviates > 20 % | high-frequency value, with a note |
no valid profile (Messung_RA_Profil_bool = 0 or profile unusable) |
high-frequency value, with a note, or "not measured" |
The footing resistance does not enter the assessment.
Worked example¶
Tower 3 of the demo campaign (--demo):
| Step | Value |
|---|---|
| position on the line | (3 − 1) / (40 − 1) = 5.1 % → end zone |
| clearing time \(t_F\) | 0.4 s |
| permissible touch voltage \(U_{TP}(0.4\,\text{s})\) | 300 V |
| short-circuit current \(I_k\) (line model) | 12.73 kA |
| earth current \(I_E = 0.66 \cdot 12.73\) kA | 8.40 kA |
| earthing impedance \(Z_{E,62}\) | 0.552 Ω |
| earth potential rise \(U_E = I_E \cdot Z_{E,62}\) | 4.64 kV > 2 · 300 V → criterion 3 not met |
| highest touch voltage (with additional resistor) | 420 V > 300 V → criterion 4 not met |
| result | MASS – measures required |
For comparison, tower 8 lies at 17.9 % (instantaneous tripping, 0.1 s,
\(U_{TP}\) = 633 V): \(U_E\) = 0.66 · 11.2 kA · 0.121 Ω = 0.89 kV ≤ 1.27 kV, so it
is compliant by the earthing-impedance criterion (ZE).