Results¶
All results are written below directory.json_export_path:
results/
├── <line>_<tower>.json one result per tower (--calc)
├── summary.xlsx one row per tower (--calc, path_summary)
├── protocols.zip PDF protocols (--zip, export_path_pdf)
├── html_files/ protocols and diagrams (--print)
└── Statistik/ statistics report (--stats)
In addition, --calc updates the grid-data workbook
with fault current, reduction factor, clearing time and position of every
measured tower.
JSON result per tower¶
The JSON file is the central result: protocols and statistics are created from it, and it is the interface for your own analyses. The keys are German for compatibility with existing data sets; the table translates them. Values copied from the measurement description keep the type of the Excel cell.
Identification and measurement set-up¶
| Key | Unit | Meaning | Source |
|---|---|---|---|
Leitung |
– | line identifier | measurement description |
Mast |
– | tower identifier | measurement description |
Datum |
– | date of the measurement (YYYY-MM-DD) |
measurement description |
Name, Vorname, Firma |
– | measuring engineer (last name, first name, company) | measurement description |
Messtechnik_Name |
– | instruments | measurement description |
Witterung |
– | weather | measurement description |
Entfernung_Hilfserder_m |
m | distance tower – current electrode \(D\) | measurement description |
Winkel_Sonde_Hilfserder_grad |
° | angle potential probe – current electrode | measurement description |
Winkel_Leitung_Hilfserder_grad |
° | angle line – current electrode | measurement description |
Messfehler_Z_pu, Messfehler_U_pu |
p.u. | measurement uncertainty of impedance and voltage | measurement description (template default 0.05 / 0.02) |
Sichtbefund |
– | visual inspection findings | measurement description |
Auswertung_Vorname, Auswertung_Name, Auswertung_Firma |
– | who evaluated the measurement | configuration (contacts) |
Grid values¶
| Key | Unit | Meaning |
|---|---|---|
Ik_kA |
kA | single-phase short-circuit current \(I_k\) at the tower |
r_pu |
– | reduction factor \(r\) of the earth wire |
Abschaltzeit_s |
s | fault clearing time \(t_F\) |
Abschaltzeit_Hinweis |
– | how the clearing time was determined (position on the line, flat value, default) |
Lage_Leitung_Prozent |
% | position of the tower on the line; "" if unknown |
Netzform |
– | network earthing from the Leitungsschutz sheet; "" if not listed |
Fall-of-potential measurement¶
| Key | Unit | Meaning |
|---|---|---|
Distanz_m |
m | potential-probe distances \(x_i\) |
ZE_Ohm |
Ω | earthing impedance \(Z_E(x_i)\) at every distance |
Distanz_62_m |
m | \(0.62\,D\) (integer part) |
ZE_62_Ohm |
Ω | assessed earthing impedance \(Z_{E,62}\) (62 % method) |
IE_A |
A | measuring current of the step/touch test \(I_{meas}\) (shown in mA in the protocol) |
RA_Ohm |
Ω | footing-resistance profile \(R_A(x_i)\); "" if not measured or not usable |
IA_A |
A | current into the tower footing during the fall-of-potential test; "" without profile |
RA_62_Ohm |
Ω | footing resistance shown in the protocol (62 % value of the profile or the high-frequency single value) |
RA_Quelle_Hinweis |
– | non-empty if the high-frequency single value was used |
US_V |
V | step voltage per metre at \(x_0 = 0\) and every probe distance, at the earth-fault current |
Touch voltages and assessment¶
| Key | Unit | Meaning |
|---|---|---|
Messpunkte_UT |
– | label of every HGT1 reading, e.g. Tower (with additional resistor 1kOhm) |
Messpunkte_UT_Termination |
– | HGT1 termination of every reading (1k, 2x1k) – language independent |
UT_V |
V | touch voltage of every reading at the earth-fault current, rounded up |
UT_max_Messung_V |
V | highest assessed touch voltage (subset chosen by touch_voltage_evaluation), rounded up |
UD_Kurve_50341 |
– | curve of the permissible touch voltage used (UD1) |
UD_V |
V | permissible touch voltage \(U_{TP}(t_F)\) |
Bewertung_Kategorie |
– | result code: ZE, UT or MASS (assessment) – language independent |
Auslegung_korrekt |
– | verdict sentence in the configured language |
Optional sections¶
"Bodenwiderstand_Schlumberger": {
"vorhanden": true,
"rho_OhmMeter": [85.0, 92.0, 110.0, 135.0, 150.0],
"DistanzA_m": [1.0, 2.0, 5.0, 10.0, 20.0],
"DistanzB_m": [0.2, 0.2, 0.2, 0.2, 0.2],
"DistanzC_m": [1.0, 2.0, 5.0, 10.0, 20.0]
},
"Erdungsspannung_Nachbarmast": {
"vorhanden": true,
"Nachbarmast": "9",
"UT_gemessen_V": [40.002, 28.001]
}
| Key | Meaning |
|---|---|
Bodenwiderstand_Schlumberger |
apparent soil resistivity \(\rho\) in Ωm and the electrode geometry in m from the …spez….xml export: a spacing of the potential electrodes, b electrode depth, c distance current – potential electrode |
Erdungsspannung_Nachbarmast |
voltages measured at the neighbouring tower (UT_<line>_<tower>-<neighbour>.txt), scaled to the earth-fault current like the own touch voltages |
rhoE_Distanz_m, rhoE_OhmMeter |
legacy single values; filled only if the measurement description has such columns |
The section Bodenwiderstand_Schlumberger keeps its name for compatibility
although the export may also be a Wenner measurement (DistanzC_m equal to
DistanzA_m). import-db stores such readings with the
correct method and geometry.
Use the codes, not the texts
For your own analyses use Bewertung_Kategorie and
Messpunkte_UT_Termination. The texts (Auslegung_korrekt,
Messpunkte_UT) depend on the configured language.
Reading the results in Python¶
import json
from pathlib import Path
import pandas as pd
rows = []
for path in Path("demo/results").glob("*.json"):
data = json.loads(path.read_text(encoding="utf-8"))
rows.append(
{
"line": data["Leitung"],
"tower": data["Mast"],
"Z_E_62": data["ZE_62_Ohm"],
"U_E_kV": data["Ik_kA"] * data["r_pu"] * data["ZE_62_Ohm"],
"U_T_max": data["UT_max_Messung_V"],
"U_TP": data["UD_V"],
"category": data["Bewertung_Kategorie"],
}
)
print(pd.DataFrame(rows).sort_values(["line", "tower"]))
To work with the measured data instead (profiles, touch voltages, soil
resistivity), import the campaign into the database with
gm-cli towers import-db and use the groundmeas analytics.
Excel summary (summary.xlsx)¶
One row per evaluated tower:
| Column | Unit | Meaning |
|---|---|---|
Leitung, Mast |
– | identifiers |
Fehlerstrom |
A | short-circuit current \(I_k\) |
Abschaltzeit |
s | clearing time |
Reduktionsfaktor |
– | reduction factor \(r\) |
Erweiterte_UTP |
– | always False (curve UD2 not used) |
ZE |
Ω | highest earthing impedance of the profile |
ZE_62 |
Ω | assessed earthing impedance \(Z_{E,62}\) |
ZE_zu_hoch |
– | True if \(Z_{E,62} > 2\,U_{TP} / I_E\) |
UT |
V | highest assessed touch voltage (not rounded) |
UT_zu_hoch |
– | True if UT > \(U_{TP}\) |
UT_zulaessig_V |
V | permissible touch voltage \(U_{TP}\) |
Lage_Prozent |
% | position on the line |
Hinweis_Abschaltzeit |
– | how the clearing time was determined |
Protocol (html_files/<line>_<tower>.html / .pdf)¶
One A4 protocol per tower in the configured language:
- Header – logo (optional) and title.
- Installation – line, tower, instruments, date.
- Measurement set-up – weather, distance and angles of the current electrode, measuring current.
- Map –
Map_<line>_<tower>.<ext>if available. - Measured values – table of \(Z_E\) and \(R_A\) over the distance, table of the touch voltages per measuring point.
- Diagrams – earthing impedance with the 62 % value and the earth potential in kV, footing resistance, step voltage, touch voltages with and without additional resistor compared with the permissible value.
- Assessment – visual findings, clearing time (with explanation), curve and value of \(U_{TP}\), fault current, reduction factor, earth current \(I_E\), \(Z_{E,62}\), \(R_A\), highest touch voltage and the verdict.
- Contacts – measuring engineer, evaluator and a signature field.
The diagrams and the stylesheet (protocol.css) are stored next to the HTML
file and referenced by file name, so the folder can be moved or archived as a
whole.
Statistics report (Statistik/Asset_Auswertung.html / .pdf)¶
A four-page report over all JSON files of the campaign for asset management: distributions of earth potential rise \(U_E\) and touch voltage \(U_T\), exceedances per line, correlations between the quantities and a list of all towers above the permissible touch voltage. Towers evaluated with the default fault current of 12 kA are marked. The report texts are German.