Quickstart¶
This page evaluates a complete synthetic demo campaign in a few minutes.
The demo contains four towers of the fictitious line LX-01, generated from
simple physical models, so you can try every feature without real data.
1. Create the demo campaign¶
$ gm-cli towers demo demo
INFO Demo campaign written to demo
INFO Run it with: gm-cli towers run --config demo/config.json
Use --language de for a German campaign (configuration, location names and
protocols in German). The folder now contains
demo/
├── config.json campaign configuration (relative paths)
├── grid_data.xlsx fault current, reduction factor, clearing time per tower
├── measurement_description.xlsx one row per measured tower
├── short_circuit_data.xlsx short-circuit currents along the line + line protection
└── measurements/
├── ZE_LX-01_3.xml COMPANO 100 fall-of-potential export
├── UT_LX-01_3.txt HGT1 touch-voltage report
├── Map_LX-01_3.png map image for the protocol
├── ... the same for towers 8, 21 and 37
├── ZE_LX-01_8_spez.Erdw..xml soil-resistivity measurement
└── UT_LX-01_8-9.txt touch voltage measured at the neighbouring tower 9
Preparing a campaign explains every file.
2. Evaluate it¶
$ gm-cli towers run --config demo/config.json
INFO Using configuration /home/me/demo/config.json
INFO --- calc ---
INFO --- print ---
INFO --- zip ---
Without a step option the three steps --calc, --print and --zip run in
this order. Add --no-pdf if Playwright or a browser is not installed yet;
the protocols are then written as HTML only. The towers commands work on
files; they do not open the groundmeas database.
3. Look at the results¶
demo/results/
├── LX-01_3.json … LX-01_8.json one result file per tower
├── summary.xlsx one row per tower
├── protocols.zip all PDF protocols
└── html_files/
├── LX-01_3.html / .pdf protocol of tower 3
├── ZE_LX-01_3.png earthing impedance and earth potential
├── RA_LX-01_3.png footing resistance
├── US_LX-01_3.png step voltage
├── UTbar_LX-01_3.png touch voltages per measuring point
└── Map_LX-01_3.png copied map image

The four towers were chosen to show all outcomes of the assessment:
| Tower | Position | Clearing time | \(U_{TP}\) | \(Z_{E,62}\) | \(U_{T,max}\) | Result |
|---|---|---|---|---|---|---|
| 3 | 5.1 % (end zone) | 0.4 s | 300 V | 0.552 Ω | 420 V | MASS – measures required |
| 8 | 17.9 % (middle) | 0.1 s | 633 V | 0.121 Ω | 95 V | ZE – compliant by earthing impedance |
| 21 | 51.3 % (middle) | 0.1 s | 633 V | 0.602 Ω | 310 V | UT – compliant by measured touch voltages |
| 37 | 92.3 % (end zone) | 0.4 s | 300 V | 0.352 Ω | 261 V | UT – compliant by measured touch voltages |
- Tower 8 has a low earthing impedance: even the full earth potential rise \(U_E = r \cdot I_k \cdot Z_E\) stays below \(2\,U_{TP}\).
- Towers 21 and 37 have a higher earth potential rise, but every measured touch voltage (scaled to the earth-fault current) is permissible.
- Tower 3 lies in the end zone of the line: the remote relay trips with time delay (0.4 s), the permissible touch voltage drops to 300 V and the measured 420 V exceed it.
- Tower 21 also shows the choice of the footing resistance: the high-frequency single value from the measurement description (3.6 Ω) differs by more than 20 % from the fall-of-potential value, so the protocol shows the single value and says so.
Results documents every field of the JSON files and the content of the protocol, Assessment procedure the decision rules.
4. Statistics over all towers (optional)¶
writes demo/results/Statistik/Asset_Auswertung.html and .pdf with
distributions, exceedances per line and correlations (the texts of this
report are German).
5. Copy the campaign into the database (optional)¶
$ gm-cli --db demo.db towers import-db --config demo/config.json
$ gm-cli --db demo.db list-measurements
$ gm-cli --db demo.db dashboard
creates one location per tower and one measurement per test, see Campaigns in the database.